I’ll See You Again
asurpriseforu
Ill See You Again - eat and pray and love and drink and smoke and give
(progress pictures)
bathroom sink and mirror, tiled altar interior, mirror exterior.
Altar is finished - no documentation is taken of finished exterior/interior/ or initial install
(there is one picture of me sitting down next to the sink installed down south in pilsen but the photo is really bad and i cant find it any way)
6 days after the install of the sink I go back to install the mirror but the sink had already been taken by the city along with my previous altar which was a couple blocks down.
On the first day of install my hands kept getting caught on the exterior of the altar which was made of tiled broken mirror. By the end of install the altar was covered in blood and I forgot to clean it up. It probably looked like a problem.